A generator must be sized for motor starting kVA, not just running kW. A direct-on-line motor draws 6–8× full-load current at start, so a 50 kW, 0.8 PF motor with a 68 kVA running load can demand 300–450 kVA at the instant of start — roughly 4–7× its running kVA — to hold voltage dip near 20–30%.

What Motor Starting kVA Means

Starting kVA is the apparent power a motor pulls in the first moments after energising, before the rotor is up to speed. At standstill an induction motor behaves almost like a transformer with a shorted secondary winding, so current is set by motor impedance rather than by driven load. A standard direct-on-line (DOL) induction motor draws 6–8× its full-load current for the few seconds it takes to accelerate.

The starting demand in kVA is: starting kVA ≈ √3 × line voltage × locked-rotor current ÷ 1000. Because locked-rotor current is 6–8× full-load current, starting kVA is also roughly 6–8× the motor running kVA. At 0.8 PF and typical efficiency, a 50 kW motor runs at about 68 kVA, so its DOL starting kVA is roughly 400–540 kVA.

Why Generators Struggle with Starting Current

A generator has finite reactance and a small flywheel compared with the grid. When a large motor starts, two things dip: voltage drops because the inrush current flows through the alternator reactance, and frequency drops because the engine must suddenly deliver the real kW behind that inrush. The AVR restores voltage in tens of milliseconds; the governor brings frequency back in 1–3 seconds.

The sizing limit is almost always voltage dip, not heating. Equipment downstream sees the dip: contactors can drop out around 15–20% below nominal, electronics can misbehave, and other running motors lose torque and slow down. That is why motor-starting generator sizing targets a maximum dip rather than a minimum kW.

Running kVA vs Starting kVA: The Quick Math

First convert the motor nameplate to running kVA: running kVA = kW ÷ (power factor × efficiency). For Philippine sites assume 0.8 PF and three-phase 440 V at 60 Hz, or 230 V single-phase. A 60 Hz set runs at 1800 rpm; a 50 Hz set runs at 1500 rpm, which changes motor speed and pump/fan duty, so confirm the supply frequency before sizing.

Then apply the starting multiplier for the chosen start method. The table gives planning multipliers against full-load current and running kVA.

Starting current and kVA multipliers by start method
Start method Starting current (x full-load) Starting kVA (x running kVA) Notes
Direct-on-line (DOL) 6–8× 6–8× Full torque, highest inrush and dip
Star-delta 2–2.7× 2–2.7× Line current about one-third of DOL; torque about one-third too
Soft starter 2.5–4× 2.5–4× Configurable current limit; check torque for the load
Variable frequency drive 1–1.5× 1–1.5× Near-unity start; size for running kW plus losses

These multipliers are planning values for standard induction motors; the manufacturer’s locked-rotor code letter on the nameplate is the authoritative starting kVA for a specific motor.

Voltage Dip: The Real Sizing Limit

A common planning formula is: generator kVA ≈ starting kVA × X″d ÷ allowed dip fraction, where X″d is the alternator subtransient reactance, typically 0.12–0.25 pu. With X″d = 0.20 and a 20% dip allowed, the generator kVA equals the starting kVA; with 30% allowed, it is about two-thirds of the starting kVA.

The 50 kW DOL motor with roughly 450 kVA of starting demand therefore needs about 300–450 kVA of generator depending on the dip the site accepts. A soft starter limited to 3× full-load current cuts starting kVA to about 200 kVA and lets a much smaller set hold the same dip, which is why AVR and governor voltage/frequency control alone cannot rescue an undersized set — the inrush still has to come from somewhere.

Step Loading and Motor Sequencing

Motors rarely start into an empty bus. Treat every step as the largest starting motor plus the load already running on the generator: the set must carry the running kW and accept the starting kVA on top without exceeding the dip limit. As a planning guide, a well-regulated generator accepts a single load step of roughly 40–60% of its rated kVA in one block; larger steps need staggered starts or more capacity.

For critical sites, start the largest motor first or bring it online with the least already-running load, and keep the ATS and generator paralleling and N+1 logic in mind if a failed start would drop the whole site.

Worked Example: Pump and Chiller Plant

A site has a 40 kVA base load, a 30 kW fan on DOL, a 75 kW chiller on star-delta, and a 15 kW pump on a soft starter. Running kVA assumes 0.8 PF and 0.92 efficiency: fan 41 kVA, chiller 102 kVA, pump 20 kVA.

Step-load worked example (0.8 PF, 0.92 efficiency)
Load kW Start method Running kVA Starting kVA
Base lighting and controls — — 40 —
Fan motor 30 DOL (7×) 41 287
Chiller motor 75 Star-delta (2.5×) 102 255
Pump motor 15 Soft starter (3×) 20 61

The running total is 203 kVA. The worst single step is the chiller starting with the 40 kVA base load already on, about 295 kVA. At 25% allowed dip and X″d = 0.20, generator kVA ≈ 295 × 0.20 ÷ 0.25 ≈ 236 kVA, so a 250 kVA set is the smallest sensible choice. Starting demand, not running load, drives the decision.

Rules of Thumb and Where They Break

  • DOL motor: generator kVA ≈ 6–8× motor running kVA for a 20–30% dip limit.
  • Star-delta: generator kVA ≈ 2–3× running kVA.
  • Soft starter at 3× full-load current: generator kVA ≈ 2–3× running kVA.
  • VFD: generator kVA ≈ 1–1.5× running kVA; size for running kW plus drive losses.
  • Worst step = largest starting motor plus the load already running.

These break when motor starting power factor is very low (0.2–0.5), when long cables add their own voltage drop, or when the engine is cold or derated for heat and altitude. Treat them as shortlist filters, then confirm against the motor starting curve.

Limitations and Conditions

  • Ratings assume 40°C ambient per ISO 8528-1 and 0.8 PF. At 45°C plan about -5%, and above 1000 m about -3% per 300 m as a planning assumption; the datasheet is the final authority.
  • Duty class matters: prime vs standby power are different ratings, and a standby-rated set cannot run motor load continuously.
  • Acceptable voltage dip is application-specific; confirm contactor drop-out, UPS transfer and electronic-load limits before locking the size.
  • Star-delta and soft starters reduce starting torque; verify the motor can still accelerate the driven load.
  • 60 Hz/1800 rpm versus 50 Hz/1500 rpm changes motor speed and pump/fan output, so a 50 Hz motor needs a 50 Hz vs 60 Hz generator match.
  • These are planning estimates, not a substitute for manufacturer motor starting curves and alternator reactance data.

Frequently Asked Questions

How many kVA do I need to start a 7.5 kW motor DOL?

A 7.5 kW motor at 0.8 PF and 0.9 efficiency runs at about 10.4 kVA, so DOL starting kVA is 62–83 kVA. At 25% allowed dip and X″d = 0.20 that points to about 50–70 kVA of generator, so a 75–100 kVA set leaves headroom for other running loads.

Does a soft starter let me use a smaller generator?

Yes. A soft starter limited to 3× full-load current cuts starting kVA from 6–8× to about 3× running kVA, roughly halving the required generator kVA for the same voltage dip. Confirm the motor still develops enough torque to accelerate the load.

What voltage dip is acceptable during motor starting?

Motor-only circuits often tolerate 20–30%, general industrial loads about 15–20%, and supplies shared with electronics or UPS about 10–15%. Contactors can drop out around 15–20% below nominal, so confirm equipment limits and use ISO 8528-5 performance classes as a reference.

Can a generator start a motor larger than its kW rating?

Sometimes, if the motor is on a VFD or soft starter and the running kW fits inside the set rating. The limit is starting kVA and voltage dip, not kW alone, because a VFD can start a motor at near-unity current while the generator only supplies running power plus losses.

How should I sequence multiple motors on one generator?

Start the largest motor first or with the least already-running load, and keep each load step within roughly 40–60% of rated kVA. Critical sites should stagger starts or add N+1 so one failed start cannot drop the whole bus.

Size the generator around your motors

Send us your motor list, start method and allowed voltage dip, and we will confirm the starting kVA and the smallest generator that meets your 500 kVA diesel generator-class or smaller site without tripping on inrush.

Request a quote WhatsApp the sales desk

Scroll to Top
WhatsApp