Telecom towers and cell sites run on modest but critical loads, so a diesel generator is usually sized from the rectifier and battery-charging demand plus site cooling. A typical macro cell site draws 3–15 kW, and a 20–30 kVA set at 0.8 PF covers it with room for battery recharge and future equipment.
Why telecom towers need a diesel generator
A cell site stays on air only while the DC plant, transmission equipment and backhaul keep working. Batteries can hold a site for minutes to a few hours, but an extended grid outage still needs an engine that starts, accepts load and runs for the duration. The generator is a second line of defence after the battery bank, and the sizing question is how much engine power is enough to run the site and recharge the batteries at the same time.
Because tower sites are often remote, rooftop or roadside, the set also has to tolerate heat, dust and restricted service access. The correct starting point is a load calculation, not a guess from tower height. See how to size a diesel generator before choosing a set.
What a cell site actually draws
A telecom site load is mostly DC plant and cooling, not heavy motors. The table below shows a typical split at 0.8 PF. These are planning figures; the rectifier nameplate and the site survey take priority.
| Load | Typical share of connected load | Notes |
|---|---|---|
| Rectifiers / DC plant | 35–45% | Powers radios and charges the battery bank |
| Site cooling and ventilation | 25–35% | Largest variable load in hot climates |
| Transmission / backhaul | 10–15% | Microwave, fibre or router equipment |
| Lighting, security, monitoring | 5–10% | Small but runs continuously |
The DC plant dominates because the rectifier converts the AC supply to DC for the radios while also recharging the batteries. During an outage, the generator must supply both the live DC load and the recharge current, which is why the rectifier nameplate is the first number to check.
Sizing a telecom tower generator
Add the running AC load, add a battery-recharge and growth margin, then divide by 0.8 PF to convert to kVA. A starting allowance is smaller than for a motor-heavy site, but the rectifier and air-conditioning compressors can still step up on transfer.
| Site type | Assumed AC load | Suggested standby kVA |
|---|---|---|
| Small cell / street site | 2–5 kW | 10–15 kVA |
| Macro cell tower | 5–15 kW | 20–30 kVA |
| Hub / aggregation site | 20–40 kW | 50–100 kVA |
These are planning assumptions at 40 °C and 0.8 PF. A hub site with multiple operators or heavy transmission equipment can go higher, and sites near residential areas often need a sound-attenuated silent diesel generator to keep noise within local limits, normally in the 70–85 dB(A) at 1 m range depending on the canopy rating.
Duty rating: standby, prime or continuous
Standby rating allows limited annual running hours at variable load with no overload. Prime rating allows running as the main power source with a 10% overload allowance for a limited period, and continuous rating is for constant load without the overload allowance. A tower in a stable grid area can use standby duty, while a site with long or frequent outages is better served by prime-rated equipment. See prime vs standby power for the full distinction.
Fuel consumption and autonomy
Diesel consumption is estimated from the load in kW. At 0.8 PF, fuel use is roughly 0.235 L/kWh at 100% load, 0.24 L/kWh at 75% load and 0.25 L/kWh at 50% load. The table below shows typical figures for common tower set sizes.
| Generator size | Output at 0.8 PF | Consumption at 100% load | Consumption at 75% load | Day tank, 8 h at 100% |
|---|---|---|---|---|
| 10 kVA | 8 kW | 1.9 L/h | 1.4 L/h | 15 L |
| 20 kVA | 16 kW | 3.8 L/h | 2.9 L/h | 30 L |
| 30 kVA | 24 kW | 5.6 L/h | 4.3 L/h | 45 L |
| 50 kVA | 40 kW | 9.4 L/h | 7.2 L/h | 75 L |
Consumption varies with load, engine condition and ambient temperature, and the day tank is normally sized for 8 hours at 100% load. For the full method and bulk-storage guidance, see generator fuel consumption and day tanks.
Temperature and altitude derating
Diesel output is rated at a reference ambient, usually 40 °C under ISO 8528-1, with a maximum altitude of 1000 m. Hotter or higher sites deliver less usable power, so the set must be oversized to compensate.
- 40 °C ambient: reference condition, no derating (ISO 8528-1).
- 45 °C ambient: about -5% output, a planning assumption to confirm with the datasheet.
- Altitude above 1000 m: about -3% output per 300 m of additional elevation, a planning assumption to confirm with the datasheet.
Philippine sites run at 60 Hz and 1800 rpm for a diesel set, with 440/254 V three-phase or 220/230 V single-phase output. A hot rooftop site with poor airflow applies both derating and cooling limits together, which can push a nominal 30 kVA requirement toward a larger set.
Working with batteries and rectifiers
The generator feeds the rectifier, and the rectifier both powers the DC bus and recharges the battery bank. The recharge current is highest right after a deep discharge, so the generator must be sized for live load plus recharge, not for live load alone. Many modern sites run the engine only when grid power is unavailable or when batteries reach a low state of charge, which extends service intervals but still requires the engine to start reliably on demand.
Redundancy and automatic transfer
An automatic transfer switch (ATS) typically restores power in about 10 seconds after a utility failure, allowing for engine start and transfer. For sites that cannot drop even briefly, two sets can be run in N+1 with a paralleling controller, so one unit can be serviced while the other carries the load. See generator paralleling and N+1 for how redundancy is arranged.
Not applicable and limitations
All figures on this page are planning values, not a quotation or a guarantee of performance. The correct set size depends on measured rectifier and cooling loads, battery recharge requirements, site ambient and altitude, and the actual duty rating in the datasheet. kVAGENSET does not state product certifications, certificate numbers, agency appointments or local stock on this page. Prices are only given as ranges or examples, never as a fixed quotation, because freight, duty and configuration change the final number. Tower and cell-site uptime requirements belong to the operator and must be confirmed with the network engineering team, not taken from this article.
Frequently asked questions
What size diesel generator does a telecom tower need?
As a planning rule, a macro cell site drawing 5–15 kW needs a 20–30 kVA standby set at 0.8 PF. Add battery-recharge current and future growth, and confirm with the rectifier nameplate and a load study at 40 °C.
Should a cell site generator be standby or prime rated?
Use standby rating where grid outages are short and rare, and prime rating where the site runs on the generator for hours or days. Prime rating allows extended running with a 10% overload allowance for a limited period at 0.8 PF.
How much fuel does a cell site generator use?
A 30 kVA set at 0.8 PF delivers 24 kW and burns about 5.6 L/h at 100% load and 4.3 L/h at 75% load, based on 0.235 and 0.24 L/kWh. Actual consumption varies with load, engine condition and ambient temperature.
How fast does the generator start after a grid failure?
With an automatic transfer switch, a diesel generator typically restores power in about 10 seconds. Battery strings bridge that gap, and the rectifier resumes charging as soon as the set accepts load.
Power your tower sites
Send us your rectifier and cooling loads, and we will size a telecom tower generator that holds the site on air through the next outage.